सुदूर नेपाललाई विश्वसँग जोड्दै

Gokuleshwar road construction on halt

२०७५ कार्तिक २, १२:४८ आरजु

The roads of Gokuleshwar which connects Dharchula hasn’t been graveled even after two decades. Previously the construction was on halt due to the floods in the month of June/July. They have been unable to resume the construction. This is also considered as the shorter route to Dharchula

कमेन्ट लोड गर्नुस